User Tools

Site Tools


obs:watcher

Differences

This shows you the differences between two versions of the page.


Previous revision
obs:watcher [Unknown date] (current) – external edit (Unknown date) 127.0.0.1
Line 1: Line 1:
 +====== Check list for upgrade June 2009 ======
  
 +**UCD** items
 +
 +  * Andor CCD
 +  * power supply for Andor cooling (7V DC)
 +  * cable for Andor (7-8m)
 +  * Andor PCI card
 +
 +  * Adapter Andor-Filterwheel
 +  * Screws to hold Andor at the adapter (M5 with head to fit into adapter)
 +  * shutter in Andor or blank filter for dark frames
 +  * filter wheel?
 +  * filter wheel control box (if it will not arrive to Boyden directly)?
 +
 +Did you think about rain protector for Andor? We have one at New Zealand
 +in case everything else fails..we can invent something on-site.
 +
 +**PK** items
 +
 +  * Zelio network interface
 +  * Ubuntu installation CD
 +  * IRAF binaries for Ubuntu installation
 +  * spare Andor cable
 +
 +**UOVS (Boyden)** items
 +
 +  * Zelio PLC, power source and USB cable
 +
 +====== June 2009 upgrade timeline ======
 +
 +  * **May 25th-May 29th** Petr drives Granada - Valencia - Paris
 +  * **May 29th-May 30th** Petr flights: [[http://www.flightstats.com/go/FlightStatus/flightStatusByFlight.do?airline=AF&flightNumber=990&departureDate=2009-05-29&x=25&y=10|AF 990]], [[http://www.flightstats.com/go/FlightStatus/flightStatusByFlight.do?airline=SA&flightNumber=1007&departureDate=2009-05-30&x=25&y=10|SA 1007]]
 +  * **May 30th-May 31st** UCD flights: [[http://www.flightstats.com/go/FlightStatus/flightStatusByFlight.do?airline=AF&flightNumber=5007&departureDate=2009-05-30&x=25&y=10|AF 5007]], [[http://www.flightstats.com/go/FlightStatus/flightStatusByFlight.do?airline=AF&flightNumber=990&departureDate=2009-05-30&x=25&y=10|AF 990]], [[http://www.flightstats.com/go/FlightStatus/flightStatusByFlight.do?airline=SA&flightNumber=1025&departureDate=2009-05-31&x=25&y=10|SA 1025]]
 +
 +  * **May 31st** Computer upgrade (Petr)
 +  * **June 1st** Telescope dismount, Andor cable installation, cable check
 +  * **June 2nd** Telescope mounted, Andor tested, operating at evening
 +  * **June 3rd** Zelio assembly (PK), Andor pipeline (UCD)
 +  * **June 4th** Zelio installed, roof tests
 +
 +So hopefully from 2nd we will be observing again, from ~5th June we will be able to run full night tests to confirm system stability. There is a lot of contingency, but we most probably will need at least some of it. By ~ 10th we shall have new pointing model and other tests performed, and having observatory running for full autonomous runs.
 +
 +  * **June 15th** Petr departure
 +  * **June 17th** UCD departure
 +
 +====== Local (and other) contacts ======
 +
 +  * **Petr Kubanek** cells +420 737 500 268, +34 661 107 995
 +  * **Alejandro Ferrero** +353 879031325
 +  * **Riccardo Felletti** +353 872350208
 +  * **Hanness Calitz** cell +27 84 59 2222, +27514417881,+27 51 4417605 
 +  * **Pieter Meintjes** +27 51 4012191
 +
 +====== Accommodation ======
 +
 +  * **30th May - 5th June** [[http://www.glencountrylodge.co.za|Glen Country Lodge]]. About 12km from Boyden. Gravel road past the lions.
 +  * **5th June - 17th June** [[http://www.placesforafrica.com/tufftop/|TuffTop B&B]]. About 10km, tarr road.
obs/watcher.txt · Last modified: 2009/05/30 00:00 (external edit)