operations:june_2009
This is an old revision of the document!
June 2009
- 24th Watcher out-of-focus, refocused. From that on, focus is kept
- 25th Watcher power failure, computers do not come after main switch trips off (for unknown reasons)
- 26th failure of Bootes 3 telescope, solved by on-site telescope reboot
- 26th failure of Watcher roof - did not fully open
operations/june_2009.1246070745.txt.gz · Last modified: 2009/06/27 00:00 (external edit)